# Transfer multiple Virtual Servers to a new server via CLI

**URL:** <https://forum.virtualmin.com/t/transfer-multiple-virtual-servers-to-a-new-server-via-cli/137407>\
**Category:** Virtualmin\
**Created:** [June 12, 2026, 8:58am UTC](https://forum.virtualmin.com/t/transfer-multiple-virtual-servers-to-a-new-server-via-cli/137407 "2026-06-12T08:58:24Z")\
**Posts on this page:** 2\
**Page:** 1

<div class="post-metadata">

**Author:** ![dragos](https://cdn.forum.virtualmin.com/letter_avatar_proxy/v4/letter/d/59ef9b/32.png) [@dragos](https://forum.virtualmin.com/u/dragos)\
**Post date:** [June 12, 2026, 8:58am UTC](https://forum.virtualmin.com/t/transfer-multiple-virtual-servers-to-a-new-server-via-cli/137407/1 "2026-06-12T08:58:24Z")

</div>

| SYSTEM INFORMATION | |
| --- | --- |
| OS type and version | centos 7.9 |
| Webmin version | 2.2 |
| Virtualmin version | 7.1 |
| Webserver version | apache |
| Related packages | SUGGESTED |

Hi. Is there any chance to use the CLI to move multiple domains form an old cenots 7.9 to a new server with Rocky10. The classic tranfsfer job requires more space than I have on my server and using it via GUI every Transfer Virtual servers takes time. Thinking of making a script with CLI commands to transfer them one after another. Is this possible?

---

<div class="post-metadata">

**Author:** ![system](https://cdn.forum.virtualmin.com/uploads/default/original/2X/c/cd96d761e326db4b2bef94886a639109bd7a8e76.svg) [@system](https://forum.virtualmin.com/u/system)\
**Post date:** [August 11, 2026, 9:00am UTC](https://forum.virtualmin.com/t/transfer-multiple-virtual-servers-to-a-new-server-via-cli/137407/3 "2026-08-11T09:00:13Z")

</div>

Closed on August 11, 2026, 9:00am UTC

This topic was automatically closed 60 days after the last reply. New replies are no longer allowed.
